Cases

500+ high-impact cases, with products covering 800+ key mining areas nationwide

The shaft electromechanical pipeline comprehensive installation and removal service is a specialized engineering solution for all categories of pipeline systems in mine vertical and inclined shafts, including ventilation, water supply and drainage, power, and signal transmission. The service covers the dismantling and replacement, precise laying, fixation and protection, and system commissioning of air ducts, water pipes, cable trays, and supports. Utilizing modular shaft working platforms, intelligent cable pulling and laying devices, and multi-point laser positioning systems, it enables parallel operation and layered arrangement of multiple pipelines within confined shaft spaces, ensuring full compliance of cable bending radii, pipeline slopes, and sealing grades with all specified parameters. Compared with traditional manual operations using shaft scaffolding, comprehensive installation efficiency is increased by more than two times, personnel in high-risk areas are reduced by 80%, and risks of falling objects, personnel falls, and pipeline cross-damage are completely eliminated, while the lifecycle maintenance cost of the pipeline system is reduced by 30%. This service is widely applicable to main shafts, auxiliary shafts, and ventilation shafts in coal and metal mines, and can be extended to pipeline system integration in underground engineering fields such as urban deep tunnels, hydropower shafts, and subway air shafts. With standardized delivery characterized by "integrated dismantling and installation, orderly arrangement, and maintainable access," it provides customers with a safe, compact, and long-term stable shaft electromechanical lifeline.
Hotline
400-623-9998
  • Public account
    Public account
  • Douyin account
    Douyin account
  • Video account
    Video account
CopyRight © 2026 中感(安徽)矿山技术有限公司 Filing: 皖ICP备2022017022号-1